Electrical Commercial Projects


FIRE PROTECTION SYSTEM

US ARMY

Dec. 2019 - March 2020

Complete annual inspection, maintenance and repair of fire alarm systems, sprinkler systems, and all emergency devices for over 75 Fort Devens buildings. Testing all devices, repairing or replacing defective devices and electrical equipment.

FIBER OPTIC COMMUNICATIONS

US ARMY

Aug. 2019 - Sept 2019

Installation of new communications cabinets throughout several towers to main building. All locations were connected with fiber optic cables and run through existing underground conduits over a 3+ mile run. Work also included the demolition of an existing guard shack and construction of a new out door communications cabinet.

 

DESIGN / BUILD AND REPLACE FIRE ALARM SYSTEM

US COAST GUARD

May 2019 - Aug. 2019

Design new fire alarm system for Coast Guard Station. Removal of preexisting system and complete installation of newly designed fire alarm system. Installations include new cabinets, emergency lighting, wiring, conduit runs, testing and finalization.

INTERIOR LIGHTING UPGRADE

US AIR FORCE RESERVE COMMAND

Sept. 2019 - Oct. 2019

Removal of all 861 interior fluorescent light fixtures and components. Replace with new LED light fixtures. All defective components such as motion sensors, dimmers, switches, hand dryers, and external emergency lighting and exit signs were disposed and replaced.


 

Solar Installation Projects


MILFORD SOLAR ROOF INSTALLATION

FUSION ENERGY SERVICES

Dec. 2019 - Feb. 2020

Complete installation of a 100kW corrugated roof mounted system. Installations included 5S roof racking systems, module placements, complete conduit and wiring install, and all electrical components and devices.

TOWNSEND PHOTOVOLTAIC SOLAR ARRAY

US ARMY CORPS OF ENGINEERS

Oct. 2019 - Nov. 2019

Complete installation of a 15kW ground mount photo voltaic system. This includes all excavations and foundation build for panel racking system, placement and securing of solar modules, and installation of all conduits, wiring, and electrical components and device. All materials and equipment were supplied by R. S. Electrical Service


 

Non-Electrical Projects & Services


DOOR REPLACEMENTS

US ARMY

Jan. 2020 - Feb. 2020

Demolition and removal of preexisting commercial building doors, including frames, glass, and surrounding structure. Construction and installation of new doors, frames, surrounding glass & structures.

CUSTODIAL SERVICE LEVEL 3

US ARMY

March 2019 - March 2020

Oversee and perform the custodial responsibilities for a commercial building. Duties include sweeping, vacuuming and mopping floors, cleaning and restocking bathrooms, cleaning windows and executing minor repairs and general maintenance work.


 

Controlled & Managed Projects


POV PARKING LOT

US ARMY 99TH DIVISION

April 2018 - July 2018

Management of project and supplied materials and workers for demolition of grass field and construction of a new complete parking lot. Work involved clearing grass field, placement of asphalt and means of drainage, light posts and all electrical installations.

ROOF REPAIRS

US ARMY

Aug. 2018 - Oct. 2018

Manage and oversee the roof repair and replacement of a commercial building with a dedicated team both in the field and in an administrative setting. Provided all materials and equipment, and oversee the safety of workers exposed to any and all hazards, especially fall hazards. Provided administrative support and quality control and assurance review.


We take great pride in our work. We will provide you with confidence in our ability to complete any project in a professional, timely, and cost effective manner.

 

 If you are looking for the right team to complete your project, meet our team and contact us now to get started.